1800 834 486

Haul Road & Ramps

Haul Road And Ramp Retaining At Mining Speed

Engineered precast retaining for haul road edges, ramps, and elevated tip heads. Installed in scheduled downtime, certified for heavy vehicle loads.

Brisbane · Sydney · Melbourne · Perth · 1800 834 486

Engineered for the Fleet

Certified for Heavy Loads

Walls engineered for loads from mining haul fleets.

Designs verified in Envirocalc® with documentation for site engineering review.

AS 1379 concrete manufactured off site to consistent quality.

Supply and install through one relationship.

Interbloc retaining wall along a mine haul road

How It Works

Minimal Disruption to Haulage

Walls go in during planned maintenance windows — hours of installation, not weeks of closed road. Blocks arrive at full strength, so traffic runs beside the wall the day it is placed.

Features & Benefits

Why Interbloc for Haul Roads

Minimal disruption to haulage

Walls go in during planned maintenance windows. Hours of installation, not weeks of closed road.

Designed for your fleet

Walls are engineered for the actual loads of your haul trucks and support equipment.

Follows the mine plan

As ramps extend and pit stages progress, take the wall down and rebuild it on the new alignment.

Full strength on arrival

Blocks arrive ready to carry load. Traffic runs beside the wall the day it is placed.

Tip head and edge protection

Build tip head walls and edge protection from the same certified blocks.

Ready to build smarter?

Talk to our team about your next project

Get a Quote